Flagstone on concrete (parking lots, access zones)
3.12 h
img
Price for 1 m2
33.54 $
Complexity
Medium
Advantages

1. Applicable to high-load areas – parking lots, garages, access routes
2. Can be used without kerbstones
3. Surface erosion/subsidence prevention

Disadvantages
1. Concrete curing time required

Everything for repair and construction in one place — AM Builder.
Here can be your advertising!

Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Heavy concrete with 20-40 mm aggregate, grade c10/12.5
0.15 m3
1.
Concrete worker
3.12 h
1.
Concrete vibrator
p.
2.
Water
0.08 m3
2.
Installer
0 h
2.
Vibrating plate
p.
3.
Gravel for construction works
0.19 m3
3.
Mobile compressor
p.
4.
32 mm unedged wooden boards
0 m3
4.
Truck-mounted crane
p.
5.
230x2x22 cutting disc for stone, concrete
0 p.
5.
Circular saw
p.
6.
Hot mastic asphalt for roofing
0 kg
6.
Level
p.
7.
Sand-cement mix
0.03 m3
7.
Shovel
p.
8.
Sand
0.17 m3
8.
Densitometer
p.
9.
Reinforcing mesh
1.08 m2
9.
Tape measure
p.
10.
Road mesh
1.08 m2
10.
Mallet
p.
11.
Paving slabs
1.02 m2
11.
Levelling string
p.
Materials
1 m2
Heavy concrete with 20-40 mm aggregate, grade c10/12.5
0.15 m3
Water
0.08 m3
Gravel for construction works
0.19 m3
32 mm unedged wooden boards
0 m3
230x2x22 cutting disc for stone, concrete
0 p.
Hot mastic asphalt for roofing
0 kg
Sand-cement mix
0.03 m3
Sand
0.17 m3
Reinforcing mesh
1.08 m2
Road mesh
1.08 m2
Paving slabs
1.02 m2
Workers
1 m2
Concrete worker
3.12 h
Installer
0 h
Instruments
1 m2
Concrete vibrator
p.
Vibrating plate
p.
Mobile compressor
p.
Truck-mounted crane
p.
Circular saw
p.
Level
p.
Shovel
p.
Densitometer
p.
Tape measure
p.
Mallet
p.
Levelling string
p.
Calculation of materials per
m2