Column foundation (pillars)
8.03 h
img
Price for 1 m3
538.17 $
Complexity
Medium
Advantages
1. Lower cost compared to strip foundations
2. Less excavation work
3. High speed of installation
Disadvantages
1. Inability to build a basement
2. Relatively low bearing capacity, suitable for lightweight concrete and wood buildings

Everything for repair and construction in one place — AM Builder.
Here can be your advertising!

Estimate for work
Materials
1 m3
Concrete
1.02 m3
Construction nails
0.05 kg
Lumber
0.65 m3
PE film
1.53 m2
Steel reinforcement
66.2 kg
Water
0 m3
Electrodes
2 kg
Workers
1 m3
Concrete fitter
7.86 h
Crane operator
0.17 h
Instruments
1 m3
Truck-mounted crane
p.
Levelling string
p.
Tape measure
p.
Level
p.
Hammer
p.
Shovel
p.
Concrete vibrator
p.
Welder
p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
m3