Lathing for the roof topcoat
Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Edged bars of coniferous species
0.01 m3
1.
Installer
0.31 h
1.
Hoist
p.
2.
1.6x100 mm nails
0.06 kg
2.
Hammer
p.
3.
32 mm unedged wooden boards
0.01 m3
3.
Wood saw
p.
4.
Builder's level
p.
5.
Tape measure
p.
Materials
1 m2
Edged bars of coniferous species
0.01 m3
1.6x100 mm nails
0.06 kg
32 mm unedged wooden boards
0.01 m3
Workers
1 m2
Installer
0.31 h
Instruments
1 m2
Hoist
p.
Hammer
p.
Wood saw
p.
Builder's level
p.
Tape measure
p.
Calculation of materials per
m2