Monolithic concrete slabs
Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Concrete
0.2 m3
1.
Concrete fitter
9.65 h
1.
Concrete vibrator
p.
2.
Construction nails
1 kg
2.
Crane operator
0.34 h
2.
Truck-mounted crane
p.
3.
Lumber
0.06 m3
3.
Level
p.
4.
Steel reinforcement
40 kg
4.
Shovel
p.
5.
Densitometer
p.
6.
Tape measure
p.
7.
Levelling string
p.
Materials
1 m2
Concrete
0.2 m3
Construction nails
1 kg
Lumber
0.06 m3
Steel reinforcement
40 kg
Workers
1 m2
Concrete fitter
9.65 h
Crane operator
0.34 h
Instruments
1 m2
Concrete vibrator
p.
Truck-mounted crane
p.
Level
p.
Shovel
p.
Densitometer
p.
Tape measure
p.
Levelling string
p.
Calculation of materials per
m2