Concrete Pillar (Post)
Materials
1 m3
Workers
1 m3
Instruments
1 m3
1.
Heavy concrete with 20-40 mm aggregate, grade c10/12.5
1.02 m3
1.
Installer
15.28 h
1.
Truck-mounted crane
p.
2.
Steel reinforcement
80.1 kg
2.
Crane operator
1.06 h
2.
Welder
p.
3.
Construction nails
0.45 kg
3.
Builder's level
p.
4.
Electrodes
1.5 kg
4.
Tape measure
p.
5.
Lumber
0.05 m3
5.
Levelling string
p.
6.
Wire
0.43 kg
6.
Concrete vibrator
p.
7.
Concrete vibrator
0 p.
7.
Wood saw
p.
8.
Wood saw
0 p.
8.
Metal cutting hacksaw
p.
9.
Metal cutting hacksaw
0 p.
9.
Hammer
p.
10.
Hammer
0 p.
Materials
1 m3
Heavy concrete with 20-40 mm aggregate, grade c10/12.5
1.02 m3
Steel reinforcement
80.1 kg
Construction nails
0.45 kg
Electrodes
1.5 kg
Lumber
0.05 m3
Wire
0.43 kg
Concrete vibrator
0 p.
Wood saw
0 p.
Metal cutting hacksaw
0 p.
Hammer
0 p.
Workers
1 m3
Installer
15.28 h
Crane operator
1.06 h
Instruments
1 m3
Truck-mounted crane
p.
Welder
p.
Builder's level
p.
Tape measure
p.
Levelling string
p.
Concrete vibrator
p.
Wood saw
p.
Metal cutting hacksaw
p.
Hammer
p.