Partition from rounded profiled logs 180 mm
2.35 h
img
Price for 1 m2
40.28 $
Complexity
Medium
Advantages
1. Increasing the stiffness of the building frame
2. Aesthetic appearance, wide possibilities for interior design
3. Good sound insulation
Disadvantages
1. Work can be carried out only when the building is completely dry and shrink

Everything for repair and construction in one place — AM Builder.
Here can be your advertising!

Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
180 mm rounded log
0.19 m3
1.
Installer
2.31 h
1.
Truck-mounted crane
p.
2.
Construction nails
0.1 kg
2.
Crane operator
0.04 h
2.
Levelling string
p.
3.
Lumber
0 m3
3.
Tape measure
p.
4.
Heat-fused tar paper
0.35 m2
4.
Level
p.
5.
Wood impregnating compound
0.05 kg
5.
Hammer
p.
6.
Jute interjoist sealant
2.55 kg
7.
Fasteners according to the design
0 m2
Materials
1 m2
180 mm rounded log
0.19 m3
Construction nails
0.1 kg
Lumber
0 m3
Heat-fused tar paper
0.35 m2
Wood impregnating compound
0.05 kg
Jute interjoist sealant
2.55 kg
Fasteners according to the design
0 m2
Workers
1 m2
Installer
2.31 h
Crane operator
0.04 h
Instruments
1 m2
Truck-mounted crane
p.
Levelling string
p.
Tape measure
p.
Level
p.
Hammer
p.
Calculation of materials per
m2