Tongue-and-groove blocks
Materials
1 m3
Workers
1 m3
Instruments
1 m3
1.
Installer
2.91 h
1.
Truck-mounted crane
p.
2.
Water
0.01 m3
2.
Crane operator
0.15 h
2.
Electric drill
p.
3.
Cement-lime mortar, grade 50
0.02 m3
3.
Builder's level
p.
4.
Tape measure
p.
5.
Levelling string
p.
6.
Hammer
p.
Materials
1 m3
1 m3
Water
0.01 m3
Cement-lime mortar, grade 50
0.02 m3
Workers
1 m3
Installer
2.91 h
Crane operator
0.15 h
Instruments
1 m3
Truck-mounted crane
p.
Electric drill
p.
Builder's level
p.
Tape measure
p.
Levelling string
p.
Hammer
p.
Calculation of materials per
m3