Laying the cable in the strut
Materials
1 m
Workers
1 m
Instruments
1 m
1.
Electric cable (grade according to the design project)
1.02 l.m.
1.
Installer
0.49 h
1.
Hammer drill
p.
2.
PVC insulating tape
0.02 p.
2.
Soldering iron
p.
3.
Cable clamp connector
1.36 p.
3.
Utility knife
p.
4.
Dowel + screw 6x40 mm
0.84 p.
4.
Pliers
p.
5.
SDS drill bit
0.01 p.
5.
Multimeter
p.
6.
Gypsum
0.08 kg
6.
Tester screwdriver
p.
7.
TM-2 wall tie
1.96 p.
7.
Screwdriver
p.
8.
Rosin
0 kg
8.
Clamp meter
p.
9.
Solder
0 kg
9.
Hammer
p.
Materials
1 m
Electric cable (grade according to the design project)
1.02 l.m.
PVC insulating tape
0.02 p.
Cable clamp connector
1.36 p.
Dowel + screw 6x40 mm
0.84 p.
SDS drill bit
0.01 p.
Gypsum
0.08 kg
TM-2 wall tie
1.96 p.
Rosin
0 kg
Solder
0 kg
Workers
1 m
Installer
0.49 h
Instruments
1 m
Hammer drill
p.
Soldering iron
p.
Utility knife
p.
Pliers
p.
Multimeter
p.
Tester screwdriver
p.
Screwdriver
p.
Clamp meter
p.
Hammer
p.
Calculation of materials per
m