Rubble foundation

8.86 h
img
Price for 1 m3
66.42 $
Complexity
Medium

Advantages

1. Strength adequate to bear a two- or three-storey building made from heavy materials
2. Fine appearance which allows for no finish
3. Resistance to unfavourable environment (low temperature, high humidity, mechanical impact)

Disadvantages

1. Complicated building process: manual labour with minimum machinery involves 
2. High requirements for building process precision: as compact laying as possible with minimum joint mortar added

3. Higher construction cost than that of a regular reinforced concrete cast-in-situ continuous footing

4. Low accuracy of material consumption estimate

Everything for repair and construction in one place — AM Builder.
Here can be your advertising!

Estimate for work

Materials

1 m3
Water
0 m3
Rubble
1.03 m3
Heavy cement mortar, grade 100
0.42 m3
Sealing mastic
2.62 kg
Heat-fused tar paper
1.8 m2

Workers

1 m3
Installer
8.86 h

Instruments

1 m3
Levelling string
p.
Tape measure
p.
Level
p.
Hammer
p.
Shovel
p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
m3