Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Installer
1.3 h
1.
Electric drill
p.
2.
Builder's level
p.
3.
Tape measure
p.
4.
Metal cutting hacksaw
p.
6.
6x60 quick-install dowel with screw
1.02 p.
9.
SDS plus concrete drill bits
0.02 p.
Materials
1 m2
1.02 m2
0.7 p.
0.7 p.
0.7 p.
0.7 p.
6x60 quick-install dowel with screw
1.02 p.
3.51 l.m.
0.51 l.m.
SDS plus concrete drill bits
0.02 p.
Workers
1 m2
Installer
1.3 h
Instruments
1 m2
Electric drill
p.
Builder's level
p.
Tape measure
p.
Metal cutting hacksaw
p.
Calculation of materials per
m2