Preparing the ceiling for painting
Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Concrete primer
0.3 kg
1.
Specialist in finishing works
0.74 h
1.
Electric drill
p.
2.
Water
0.01 m3
2.
Putty knife
p.
3.
Cement putty
1.3 kg
3.
Construction ditch
p.
4.
Waterproof sandpaper
0.01 m2
4.
Paint brush
p.
5.
Floater
p.
6.
Painting table
p.
Materials
1 m2
Concrete primer
0.3 kg
Water
0.01 m3
Cement putty
1.3 kg
Waterproof sandpaper
0.01 m2
Workers
1 m2
Specialist in finishing works
0.74 h
Instruments
1 m2
Electric drill
p.
Putty knife
p.
Construction ditch
p.
Paint brush
p.
Floater
p.
Painting table
p.
Calculation of materials per
m2