Installing the collector (comb)
Materials
1 pcs
Workers
1 pcs
Instruments
1 pcs
1.
Manifold (rake)
1 p.
1.
Installer
0.77 h
1.
PTFE joint sealant tape
p.
2.
Pipe wrench
p.
3.
Adjustable spanner
p.
Materials
1 pcs
Manifold (rake)
1 p.
Workers
1 pcs
Installer
0.77 h
Instruments
1 pcs
PTFE joint sealant tape
p.
Pipe wrench
p.
Adjustable spanner
p.
Calculation of materials per
pcs