Cement-sand screed on particulate insulation

0.024 h
img
Price for 1 f2
0.5 $
Complexity
Low

Advantages

1. Thermal insulation for unheated auxiliary premises (vaults, garages, storerooms) 
2. Moisture resistance 
3. Strength and durability

Disadvantages

1. Long curing time

Estimate for work

Materials

Edged bars of softwooded broadleaved species
0 ft3
Dry cement-sand screed mix
0.004 lb
Bag fabric for cleaning
0.04 ft2

Workers

Screed master
0.024 h

Instruments

Concrete vibrator
0 p.
Electric grinder
0 p.
Shotcrete machine
0 p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
f2
  • img