Column foundation (pillars)

0.228 h
img
Price for 1 f3
381.01 $
Complexity
Medium

Advantages

1. Lower cost compared to strip foundations
2. Less excavation work
3. High speed of installation

Disadvantages

1. Inability to build a basement
2. Relatively low bearing capacity, suitable for lightweight concrete and wood buildings

Estimate for work

Materials

Concrete
1.015 ft3
Construction nails
0.003 lb
Lumber
0.648 ft3
PE film
0.466 ft2
Steel reinforcement
4.145 lb
Water
0.004 ft3
Electrodes
0.125 lb

Workers

Concrete fitter
0.223 h
Crane operator
0.005 h

Instruments

Truck-mounted crane
0.028 p.
Levelling string
0.028 p.
Tape measure
0.028 p.
Level
0.028 p.
Hammer
0.028 p.
Shovel
0.028 p.
Concrete vibrator
0.028 p.
Welder
0.028 p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
f3
Summary: 381.01 $