Partition from rounded profiled logs 180 mm

2.353 h
img
Price for 1 m2
86.44 $
Complexity
Medium

Advantages

1. Increasing the stiffness of the building frame
2. Aesthetic appearance, wide possibilities for interior design
3. Good sound insulation

Disadvantages

1. Work can be carried out only when the building is completely dry and shrink

Estimate for work

Materials

180 mm rounded log
0.186 m3
Construction nails
0.102 kg
Lumber
0.003 m3
Heat-fused tar paper
0.354 m2
Wood impregnating compound
0.053 kg
Jute interjoist sealant
2.55 kg
Fasteners according to the design
0 m2

Workers

Electrician-Installer
2.31 h
Crane operator
0.043 h

Instruments

Truck-mounted crane
p.
Levelling string
p.
Tape measure
p.
Level
p.
Hammer
p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
m2
Sum: 86.44 $