Kerbs for paths

0.235 h
img
Price for 1 f
65.15 $
Complexity
Medium

Estimate for work

Materials

Curb stone
1 ft
Concrete
0.618 ft3
Water
2.863 ft3
Sand
0.194 ft3
Heavy cement mortar, grade 100
0.005 ft3

Workers

Crane operator
0.003 h
Electrician-Installer
0.232 h

Instruments

Shovel
0.305 p.
Truck-mounted crane
0.305 p.
Tape measure
0.305 p.
Builder's level
0.305 p.
Level
0.305 p.
Mallet
0.305 p.
Levelling string
0.305 p.
img
Material calculation
Calculate materials, workers, and tools for the quadrature you need
f
Summary: 65.15 $