Wall cladding
Materials
1 m2
Workers
1 m2
Instruments
1 m2
1.
Wooden lining
1.1 m2
1.
Specialist in finishing works
0.17 h
1.
Builder's level
p.
2.
Construction nails
0.07 kg
2.
Hammer
p.
3.
Utility knife
p.
4.
Wood saw
p.
Materials
1 m2
Wooden lining
1.1 m2
Construction nails
0.07 kg
Workers
1 m2
Specialist in finishing works
0.17 h
Instruments
1 m2
Builder's level
p.
Hammer
p.
Utility knife
p.
Wood saw
p.
Calculation of materials per